2016

News

EMERGENCY FLOOD CONTROL ON SIX KILOMETERS OF THE SAVA RIVER

Emergency flood control is performed on 6 kilometers of the Sava River flood embankment near Klenk and Hrtkovci settlements. Regular flood control is still performed on the remaining section of approximately 114 kilometers that are under jurisdiction of PWMC Vode Vojvodine. Emergency flood control was announced and introduced on Stojšića

Опширније »
News

DREDGING WORK PLAN FOR 2016

According to dredging work plan for „Lala“ and „Dunav“ floating dredgers for 2016, around 265,000 cubic meters of sludge should be removed from the DTD Hydro system. These works will begin mid-March with cca 95 mln Dinars being invested in dredging works. Works will be performed on five locations: Bečej–Bogojevo

Опширније »
News

THREE BILLIONS FOR WATER STRUCTURE MAINTENANCE

This year’s programme of operations of PWMC Vode Vojvodine intends nearly 3 bln Dinars for maintenance of water structures and facilities on the territory of Vojvodina. Around 2.3 bln Dinars is intended for maintenance and operation of the drainage system and regulation works on canal network. An amount of cca

Опширније »
  • Кориснички сервис

    Бесплатан позив

    0800 21 21 21

    Радно време 9-14 часова

    korisnik@vodevojvodine.rs


    ШАЛТЕР САЛА СЛУЖБЕ ЗА НАКНАДЕ

    РАДНИМ ДАНИМА 8-14 ЧАСОВА
    Кориснички сервис
    Бесплатан позив

    0800 21 21 21

    Радно време 9-14 часова
    korisnik@vodevojvodine.rs

    ШАЛТЕР САЛА СЛУЖБЕ ЗА НАКНАДЕ

    РАДНИМ ДАНИМА 8-14 ЧАСОВА