According to dredging work plan for „Lala“ and „Dunav“ floating dredgers for 2016, around 265,000 cubic meters of sludge should be removed from the DTD Hydro system. These works will begin mid-March with cca 95 mln Dinars being invested in dredging works.
Works will be performed on five locations: Bečej–Bogojevo Canal near Srbobran and Bečej Shiplock; Banatska Palanka–Novi Bečej Canal near Botoš and at the confluence with Brzava River and Bački Petrovac–Karavukovo Canal near Deronje settlement. These works fall under the regular maintenance of Danube-Tisza-Danube Hydro system.